Rodney Colson Elementary School, Renovations
Seffner, FL (Tampa Bay Region)
Client
Hillsborough County School Board
Size
65,615-SF
Construction Cost
$5.6 million
Completion Date
2020
Delivery Method
Design-Bid-Build
Project Description
In this phased project, VoltAir helped to renovate the interior, replace the roof, and perform HVAC and electrical upgrades for Colson Elementary School. The project work was delivered in an accelerated schedule to meet the client’s permitting and construction deadlines. The campus-wide HVAC system replacement included replacing the chilled water (CHW) air handling units (AHUs), variable air volume (VAV) boxes, all ductwork, and ventilation/exhaust/outside air (OSA) components. VoltAir also conducted HVAC system testing/balancing and commissioning activities; and replaced the ceiling tile systems along with performing related electrical modifications.
VoltAir provided mechanical, electrical, plumbing, and fire protection engineering and technology design services on the project.