Tampa Preparatory School, Lab & Gym Renovation / Expansion

Tampa, FL

Client
Tampa Preparatory School

Size
6,000 SF

Construction Cost
$2.5 million

Completion Date
2013

Delivery Method
Design-Bid-Build

Project Description

Expansion to the locker rooms for the existing boys and girls locker room located at the gymnasium. The renovation portion of the project consisted of converting the existing second floor cafeteria into offices and labs in the same location.